Applied Mathematics and Nonlinear Sciences
Journal license

Journal

Applied Mathematics and Nonlinear Sciences


Volume
& Issue

Volume 8, Issue 2


Published
on

September 30, 2023


Pages


DOI

Article

Analysis of power system scheduling operation mode based on multi-objective optimization algorithm

Check for updates


Authors

Bo Bao Affiliation:
Power Dispatch and Control Center of Guangdong Power Grid Co., Ltd., Guangzhou, Guangdong, 510220, China
, Jian Zuo Affiliation:
Power Dispatch and Control Center of Guangdong Power Grid Co., Ltd., Guangzhou, Guangdong, 510220, China
, Shuiping Zhang Affiliation:
Power Dispatch and Control Center of Guangdong Power Grid Co., Ltd., Guangzhou, Guangdong, 510220, China
, Lian Tu Affiliation:
Power Dispatch and Control Center of Guangdong Power Grid Co., Ltd., Guangzhou, Guangdong, 510220, China
, Yixing Chen Affiliation:
Power Dispatch and Control Center of Guangdong Power Grid Co., Ltd., Guangzhou, Guangdong, 510220, China
, Feng Qian Affiliation:
Power Dispatch and Control Center of Guangdong Power Grid Co., Ltd., Guangzhou, Guangdong, 510220, China
, Feng Liu Affiliation:
Beijing Tsintergy Technology Co., Ltd., Beijing, 100084, China
and Binbin Zhang Affiliation:
Beijing Tsintergy Technology Co., Ltd., Beijing, 100084, China


Abstract

Exploring the majorization strategy of the power system (PS) dispatching operation is to achieve economic cost reduction and reduce environmental pollution. In this paper, starting from the PS dispatching model, the adaptive Corsi variance is introduced to get rid of the local optimum using particle swarm majorization procedure, and the adaptive Corsi variance multiple swarm coevolutionary procedure is constructed through coevolutionary strategy and information sharing strategy. The MCPSO-ACPM procedure is used to optimize the PS scheduling operation model, and experiments are conducted on both load and unit for the optimized scheduling model. From the load majorization results, the peak-to-valley variance is concentrated from 176.02KW to 110.51KW compared with the original load, and the peak-to-valley ratio is reduced by 0.718, which saves customers 98.63 yuan in electricity purchase cost. From the scheduling majorization prediction, the PS output power prediction value of 1 min during the day is closest to the actual measured value of output power, and its prediction deviation is about 2.67%. This shows that the use of a multi-objective majorization procedure can realize the optimal dispatch of PS and achieve the reduction of economic cost.


Keywords

Power system scheduling, Adaptive Corsi variance, Co-evolutionary strategy, MCPSO-ACPM procedure, Optimal scheduling model., 78-02


Citation

Bao, B., Zuo, J., Zhang, S., Tu, L., Chen, Y., Qian, F., Liu, F., & Zhang, B. (2023). Analysis of power system scheduling operation mode based on multi-objective optimization algorithm. Applied Mathematics and Nonlinear Sciences, 8(2). https://doi.org/10.2478/amns.2023.2.00406

Published by: Engineering Journals

Engineering Journals Logo