Optimization Study on Carbon Trading and Constructive Repetitive Project Scheduling in the Context of Internet Era

Check for updates


Authors

Lin Zhou Affiliation:
North China Electric Power University, Beijing, 071003, China.
, Xinyu Guo Affiliation:
North China Electric Power University, Beijing, 071003, China.
and Hao Wang Affiliation:
North China Electric Power University, Beijing, 071003, China.


Abstract

This paper constructs a carbon trading market trade-off problem model based on the time-constrained relationship of process families in RSM. By analyzing the repetitive construction project processes, linear, block, and strip processes are refined. The time-constrained relationship between process families in the RSM is studied, and the expression formula is derived. Process continuity and resource continuity in repetitive construction projects are analyzed to reduce the time required to complete a unit of work. The process duration of the project is determined by optimizing the amount of new resources and human resources used. The results show that when the length of the carbon emission interval is at (0.5, 2]t, when the length of the carbon emission interval is small, the role of RSM process time carbon trading price is larger.


Keywords

RSM, time-constrained relationship, Resource continuity, carbon trading market trade-off, 91-02


Citation

Zhou, L., Guo, X., & Wang, H. (2023). Optimization study on carbon trading and constructive repetitive project scheduling in the context of internet era. Applied Mathematics and Nonlinear Sciences, 8(2). https://doi.org/10.2478/amns.2023.2.00679