Applied Mathematics and Nonlinear Sciences
Journal license

Journal

Applied Mathematics and Nonlinear Sciences


Volume
& Issue

Volume 9, Issue 1


Published
on

November 5, 2024


Pages


DOI

Article

Research on the evaluation of equipment condition in assembly line workshop based on time series analysis

Check for updates


Authors

Meng Yu Affiliation:
State Grid Jiangxi Power Supply Service Management Center, Nanchang, Jiangxi, 330000, China.
, Yan Zhao Affiliation:
State Grid Jiangxi Power Supply Service Management Center, Nanchang, Jiangxi, 330000, China.
, Dongwen Wu Affiliation:
State Grid Jiangxi Power Supply Service Management Center, Nanchang, Jiangxi, 330000, China.
, Maolin Pei Affiliation:
State Grid Jiangxi Power Supply Service Management Center, Nanchang, Jiangxi, 330000, China.
and Tao Hu Affiliation:
State Grid Jiangxi Power Supply Service Management Center, Nanchang, Jiangxi, 330000, China.


Abstract

Intelligent manufacturing requires the full use of modern information technology in traditional production scenarios, and assembly line workshops also need intelligent industrial upgrading in production management. To this end, this paper proposes a time series-based evaluation study of the state of equipment in an assembly line workshop. Through the theoretical analysis of the characteristics of assembly line workshop equipment state data, time series data mining technology is used to collect research and analysis data, which is then pre-processed. The differential autoregressive average model is used to construct the assembly line workshop equipment state evaluation model, and the simulation analysis of the assembly line workshop equipment state is carried out by combining the corresponding parameters with the research data. The data shows that the MAPE value of the ARIMA model for equipment failure is −0.0706%, which is more significant compared to the prediction effect of the traditional CNN model. In addition, the error range of the ARIMA model prediction of equipment state parameters of the assembly line workshop is 0.01~0.02. This study can accurately assess the equipment state of the assembly line workshop and lay the foundation for its intelligent transformation.


Keywords

ARIMA model, Time series, Assembly line workshop, Equipment condition assessment, 15A60


Citation

Yu, M., Zhao, Y., Wu, D., Pei, M., & Hu, T. (2024). Research on the evaluation of equipment condition in assembly line workshop based on time series analysis. Applied Mathematics and Nonlinear Sciences, 9(1). https://doi.org/10.2478/amns-2024-3033

Published by: Engineering Journals

Engineering Journals Logo